Completed

The FC loan of USD 70 million to the state-owned Uruguayan energy supplier Administración Nacional de Usinas y Trasmisiones Eléctricas (UTE) is used to co-finance the construction of the Punta del Tigre B gas-fired combined-cycle power plant with a capacity of 532 MW, together with the Inter-American Development Bank IDB and the Latin American Development Bank CAF. Uruguay is facing the challenge

Project Information FAQ

Project Information

5 Q
The project “Co-financing of the combined cycle power plant "Punta del Tigre B"” is an infrastructure initiative in the Geothermal sector, located in Uruguay. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC loan of USD 70 million to the state-owned Uruguayan energy supplier Administración Nacional de Usinas y Trasmisiones Eléctricas (UTE) is used to co-finance the construction of the Punta del Tigre B gas-fired combined-cycle power plant with a capacity of 532 MW, together with the Inter-American Development Bank IDB and the Latin American Development Bank CAF. Uruguay is facing the challenge of meeting its constantly increasing demand for electricity as it grows economically. The country currently has a high proportion of hydropower, but the expansion options for this have been exhausted. In addition, droughts are frequent. During these times of low hydropower production, the small country is increasingly dependent on expensive electricity imports from its neighboring countries Argentina and Brazil, as well as on its existing thermal energy generation capacities. However, the latter are largely outdated and inefficient and therefore have high costs as well as environmental and climate impacts. In order to diversify its energy supply and make it even more environmentally and climate-friendly, the country has begun a major expansion of its wind energy capacity. This is increasing the need for efficient backup capacity to compensate for weather-related load fluctuations in renewable energies. This backup capacity will be made available in the future by the new gas-fired combined cycle power plant. The aim of the project is to increase the security of supply and stability of the Uruguayan energy supply system and to ensure this in a sustainable manner. The project is therefore intended to contribute to the overarching development policy goal of sustainable economic growth in Uruguay.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data