CO-OP/HSBCC Canal Pressurization
Sector: Water Supply and Storage • Location: Huntsville, Utah, United States of America
Source: Dodge
The Project includes the following Work: Approximately 14,900 feet of 24 to 20 fused HDPE pipe installed by open trench 73 metered turnout connections Precast concrete screening inlet structure Air valve and drain assemblies Demolition of 38 existing structures and replacing with HDPE pipe Grading and reseeding
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bid results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project includes the following Work: Approximately 14,900 feet of 24 to 20 fused HDPE pipe installed by open trench 73 metered turnout connections Precast concrete screening inlet structure Air valve and drain assemblies Demolition of 38 existing structures and replacing with HDPE pipe Grading and reseeding |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
