CO-OP/HSBCC Canal Pressurization
Bid results · Utah · Last reported Aug 2025
Source: Dodge
The Project includes the following Work: Approximately 14,900 feet of 24 to 20 fused HDPE pipe installed by open trench 73 metered turnout connections Precast concrete screening inlet structure Air valve and drain assemblies Demolition of 38 existing structures and replacing with HDPE pipe Grading and reseeding
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial
- Location
- Huntsville, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CO-OP/HSBCC Canal Pressurization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Approximately 14,900 feet of 24 to 20 fused HDPE pipe installed by open trench 73 metered turnout connections Precast concrete screening inlet structure Air valve and drain assemblies Demolition of 38 existing structures and replacing with HDPE pipe Grading and reseeding |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Huntsville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
