logo

CO Rio Bogota Environmental Recuperation and Flood Control Project

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank

Project
Closed

The objective of the Rio Bogota Environmental Recuperation and Flood Control Project for Colombia is to assist the Borrower to transform the Rio Bogota River into an environmental asset for the Bogota Distrito Capital metropolitan region by improving water quality, reducing flood risks and creating multi-functional areas along the river. There are four components to the project, the first componen

Project Information FAQ

Project Information

5 Q
The project “CO Rio Bogota Environmental Recuperation and Flood Control Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Rio Bogota Environmental Recuperation and Flood Control Project for Colombia is to assist the Borrower to transform the Rio Bogota River into an environmental asset for the Bogota Distrito Capital metropolitan region by improving water quality, reducing flood risks and creating multi-functional areas along the river. There are four components to the project, the first component being upgrading and expansion of the Salitre Wastewater Treatment Plant (WWTP). The second component is the flood control and Rio Bogota environmental restoration works. This component will reduce flood risk and establishment of multifunctional zones along the Río Bogota river through the carrying out of flood control and environmental improvement works, including river dredging, embankment construction, restoration of riparian habitats, meanders and wetlands, land acquisition, involuntary displacement of people, landscape design, and establishment of parks, and the provision of consultants' services for the design, construction and supervision therefor. The third component is the environmental and water studies. Finally, the fourth component is the project management and administration. This component will strengthening the capacity of the Borrower for the day-to-day implementation of the project, including: (a) compliance with financial, environmental and procurement management, reporting requirements and monitoring and supervision activities, implementation of the Resettlement Action Plan (RAP) and Environmental Management Plan (EMP), (b) the carrying out of a public outreach campaign, (c) training, and (d) the provision of consultants' services therefor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data