CO2 Terminal at Port Esbjerg
The owner, status and timeline of this project. A free account opens every field.
Source: The Chemical Engineer
A new CO2 terminal is under construction in Port Esbjerg to serve as the onshore hub for receiving, storing, and loading liquified CO2 onto the Carbon Destroyer 1 vessel. The terminal will have six large storage tanks and infrastructure to support continuous CO2 transportation, temporarily storing captured CO2 delivered by truck before transfer to the vessel.
- Status
- Under Construction
- Sector
- Chemical (Industrial), Manufacturing (Industrial)
- Location
- Esbjerg, Denmark
- Updated
- 22 Jul 2026
- Source
- The Chemical Engineer
ConstructChat
Ask ConstructChat about CO2 Terminal at Port Esbjerg
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A new CO2 terminal is under construction in Port Esbjerg to serve as the onshore hub for receiving, storing, and loading liquified CO2 onto the Carbon Destroyer 1 vessel. The terminal will have six large storage tanks and infrastructure to support continuous CO2 transportation, temporarily storing captured CO2 delivered by truck before transfer to the vessel. |
Original sector | Energy |
Location
Country | Denmark |
City | Esbjerg |
Source
Source | The Chemical Engineer |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2025-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in Denmark
- SELECTCO2
- HALDOR TOPSOE RDI RSFF
- HARTVIG JENSEN
- Part of project 'EI upgraded biogas'
- DANISCO RDI
- HALDOR TOPSOE RDI
- Conduct a feasibility study on LNG infrastructure for short sea shipping
- Big Data and eco-innovative resource use in the NSR Greenhouse industry - greening the growth in horticultural production
