logo
ProjectPlanned

Coal-fired Power Generation Fleet Refurbishment

The owner, status and timeline of this project. A free account opens every field.

Source: Pipeline Online

The Saskatchewan government announced the intention to refurbish the existing coal-fired power generation fleet instead of shutting it down by December 31, 2029. The refurbishment is estimated to cost $900 million and is part of a plan to use coal as a bridge to eventual nuclear power generation. The plan includes extending the operation of coal plants like the Shand Power Station potentially unti

Status
Prospective
Sector
Natural Gas, Nuclear, Bridge, Government, Power Generation (CCGT)
Location
Estevan, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Pipeline Online

ConstructChat

Ask ConstructChat about Coal-fired Power Generation Fleet Refurbishment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Coal-fired Power Generation Fleet Refurbishment” is an infrastructure initiative in the Natural Gas sector, located in Estevan, Saskatchewan, Canada. Taiyo aggregates data on it from Pipeline Online.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Saskatchewan government announced the intention to refurbish the existing coal-fired power generation fleet instead of shutting it down by December 31, 2029. The refurbishment is estimated to cost $900 million and is part of a plan to use coal as a bridge to eventual nuclear power generation. The plan includes extending the operation of coal plants like the Shand Power Station potentially until 2042, despite federal regulations requiring shutdown by 2029.

Original sector

Energy

Budget

Location

Country

Canada

State

Saskatchewan

City

Estevan

Source

Source

Pipeline Online

URL

More Details

Record type

Project

Sector

Natural Gas, Nuclear, Bridge, Government, Power Generation (CCGT)

Article published date

2026-03-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project