Coal Handling Plant at Chatti Bariatu Coal Mining Project
Sector: Power Generation (CCGT) • Location: India
Source: PSU Connect
NTPC Mining Limited has issued a tender for the design, engineering, supply, erection, and commissioning of a complete Coal Handling Plant at the Chatti Bariatu Coal Mining Project. The project includes mechanical, electrical, civil, structural, and control systems to establish an advanced coal handling system supporting mining operations and strengthening fuel supply security for power generation
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- PSU Connect
ConstructChat
Ask ConstructChat about Coal Handling Plant at Chatti Bariatu Coal Mining Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NTPC Mining Limited has issued a tender for the design, engineering, supply, erection, and commissioning of a complete Coal Handling Plant at the Chatti Bariatu Coal Mining Project. The project includes mechanical, electrical, civil, structural, and control systems to establish an advanced coal handling system supporting mining operations and strengthening fuel supply security for power generation. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | PSU Connect |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-04-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
