Coastal Embankment Improvement Project - Phase I (CEIP-I)
Sector: Water Supply and Storage • Location: Bangladesh
Source: World Bank
The objectives of the First Phase of the Coastal Embankment Improvement Project for Bangladesh are to (a) increase the area protected in selected polders from tidal flooding and frequent storm surges, which are expected to worsen due to climate change; (b) improve agricultural production by reducing saline water intrusion in selected polders; and (c) improve the Government of Bangladeshs capacity
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Coastal Embankment Improvement Project - Phase I (CEIP-I)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the First Phase of the Coastal Embankment Improvement Project for Bangladesh are to (a) increase the area protected in selected polders from tidal flooding and frequent storm surges, which are expected to worsen due to climate change; (b) improve agricultural production by reducing saline water intrusion in selected polders; and (c) improve the Government of Bangladeshs capacity to respond promptly and effectively to an eligible crisis or emergency. The project has five components. (1) Rehabilitation and improvement of polders component will finance activities that aim to increase community resilience to tidal flooding and storm surges. (2) Implementation of social and environmental management frameworks and plans component will support consultation with and strengthening of polder stakeholders and beneficiaries. (3) Construction supervision, monitoring and evaluation of project and coastal zone monitoring component will cover consulting services for (i) surveys, designs of remaining polders to be included in the project and (ii) construction supervision of rehabilitation and improvement of coastal embankments; (iii) continuously monitoring project activities and providing feedback to the government and the implementing agency on the projects performance. (4) Project management, technical assistance, training and strategic studies component will support Bangladesh Water Development Board in implementing the project. (5) Contingent emergency response component will be contingent upon the fulfillment of the following conditions: (i) the Government of Bangladesh has determined that an eligible crisis or emergency has occurred and the Bank has agreed and notified the Government; (ii) the Ministry of Finance has prepared and adopted the Contingent Emergency Response (CER) Implementation Plan that is agreed with the Bank; (iii) Bangladesh Water Development Board has prepared, adopted, and disclosed safeguards instruments required as per Bank guidelines for all activities from the CER Implementation Plan for eligible financing under the CERC. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Social Protection,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Bangladesh |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bangladesh
- Bibiyana South CombinedCycle Power Plant
- Maitree Super Thermal Power Project Bangladesh
- Payra Sea Port Dredging Concession
- Chittagong Container Terminal (second contract)
- SAIDABAD RAW WATER CONVEYOR
- Sirajganj 225 MW Combined Cycle Power Plant (2nd Unit-Dual Fuel)
- Moheshkhali Floating LNG Terminal
- Gandharbpur Drinking Water Treatment Plant
