Coastal Embankment Rehabilitation
Sector: Water Supply and Storage • Location: Bangladesh
Source: World Bank Group
The objectives of the Coastal Embankment Rehabilitation & Reconstruction Project are: 1) cyclone protection; 2) improved agricultural production; and 3) introduction of improved technology and improved methods of embankment maintenance. The project includes the following components: 1) rehabilitation and improvements to 12 sea-facing embankments; 2) minor rehabilitation and improvements to the non
- Status
- Closed
- Sector
- Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Coastal Embankment Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Coastal Embankment Rehabilitation & Reconstruction Project are: 1) cyclone protection; 2) improved agricultural production; and 3) introduction of improved technology and improved methods of embankment maintenance. The project includes the following components: 1) rehabilitation and improvements to 12 sea-facing embankments; 2) minor rehabilitation and improvements to the non-coastal sections of the polders in the Mid-Term Program; 3) afforestation of embankment slopes and a strip of 50 to 200 meters of foreshore to reduce cyclone damage and embankment maintenance costs; 4) improved operation-maintenance of all polders in the Mid-Term Program; 5) a program of compensation, rehabilitation and resettlement of people displaced by the project; 6) environmental monitoring and provision for appropriate mitigating measures; 7) studies to investigate the possibility of cost-effective town protection works for Sandwip; 8) technical assistance for implementation support for components 1) through 7) above, and for coordination between the project and other projects concerning agricultural production and NGO activities; 9) training of staff of implementing agencies and participating NGOs, and for community participants; and 10) vehicles and minor equipment required for GOB supervision of project implementation, and for afforestation. |
Original sector | FY17 - Public Administration,FY17 - Social Protection,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Bangladesh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bangladesh
- Bibiyana South CombinedCycle Power Plant
- Maitree Super Thermal Power Project Bangladesh
- Payra Sea Port Dredging Concession
- Chittagong Container Terminal (second contract)
- SAIDABAD RAW WATER CONVEYOR
- Sirajganj 225 MW Combined Cycle Power Plant (2nd Unit-Dual Fuel)
- Moheshkhali Floating LNG Terminal
- Gandharbpur Drinking Water Treatment Plant
