Coastal LNG Import Terminal and Gas-Fired Power Plant Project
Sector: Government
Source: AD HOC NEWS
Development of a coastal LNG import terminal linked to a new gas-fired power plant. The project involves contracting for LNG supply, receiving cargoes at the terminal, regasifying the liquefied gas, and transporting it via pipelines to the generation facility. The project targets local utilities, government entities, or large industrial users seeking reliable electricity and cleaner fuel options.
- Status
- Prospective
- Sector
- Government, LNG, Power Generation (CCGT), Manufacturing (Industrial), Natural Gas
- Updated
- 22 Jul 2026
- Source
- AD HOC NEWS
ConstructChat
Ask ConstructChat about Coastal LNG Import Terminal and Gas-Fired Power Plant Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Development of a coastal LNG import terminal linked to a new gas-fired power plant. The project involves contracting for LNG supply, receiving cargoes at the terminal, regasifying the liquefied gas, and transporting it via pipelines to the generation facility. The project targets local utilities, government entities, or large industrial users seeking reliable electricity and cleaner fuel options. |
Original sector | Energy |
Location
| Not available for this record. |
Source
Source | AD HOC NEWS |
URL |
More Details
Record type | Project |
Sector | Government, LNG, Power Generation (CCGT), Manufacturing (Industrial), Natural Gas |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
