COASTAL POLLUTION CONTROL
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objectives of the Coastal Pollution Control and Water Supply Project are (1) to improve sanitary and environmental conditions in three major urban areas of the coastal zone; (2) to improve and extend water supply and wastewater collection and disposal services in selected areas; (3) to reduce groundwater and surface water pollution; (4) to restore the recreational use of bathing beaches; (5) t
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Residential
- Location
- Lebanon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about COASTAL POLLUTION CONTROL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Coastal Pollution Control and Water Supply Project are (1) to improve sanitary and environmental conditions in three major urban areas of the coastal zone; (2) to improve and extend water supply and wastewater collection and disposal services in selected areas; (3) to reduce groundwater and surface water pollution; (4) to restore the recreational use of bathing beaches; (5) to ensure satisfactory operation and maintenance of equipment installed or rehabilitated under the National Emergency Reconstruction Program (NERP); and (6) to restructure the sector to improve services through commercial operation and increased private sector participation. The project consists of the following major components: (1) extending water supply facilities in Kesrouan and Nabatiye sub-project areas and wastewater collection and disposal systems in Kesrouan, Saida, Sour, and Nabatiye sub-project areas; (2) entering into countrywide operation, maintenance, and training services contracts for mechanical and electrical equipment installed or rehabilitated under the NERP, including consumable and spare part procurement; (3) obtaining operation and maintenance equipment and office facilities for the five regional water authorities and for environmental monitoring; and (4) securing consultant services and technical assistance to establish and develop sector institutions nationally and regionally, for environmental monitoring, for project management, for construction supervision and performance review auditing. |
Original sector | FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management |
Budget |
Location
Country | Lebanon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Lebanon
- Individual Consultant for the irrigation rehabilitation and modernization project + Add no.1
- Danniye Irrigation: supervision
- Consultancy Services to the Ministry of Energy and Water (MOEW) for the Electricity Sector Reform Program + Add no.1&2&3&4&5
- South Bekaa Irrigation Scheme - Detailed Design & Tender Documents (Phase I - 2,000 hectares)
- Cleaning of Saida and its suburbs Waste Water and Rain Water networks : Technical Assistance and Supervision
- Chouf coastal area wastewater: extension of feasibility study
- SIUC-1 Water Supply and Wastewater (World Bank financing)
- Management Support Services Contract for Consulting Services for Strengthening the Capacity of the Ministry of Energy and Water (MOEW) to implement Power Sector Policy Reforms
