Coastal Road Dust Mitigation
Sector: Water Supply and Storage • Location: Mumbai, Maharashtra, India
Source: Times of India
The Maharashtra Pollution Control Board (MPCB) has mandated the Brihanmumbai Municipal Corporation (BMC) to implement dust control measures at coastal road construction sites within two days. This includes covering loose earth, removing dust from barricades, and implementing a water-fogging system during material handling.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Road, Government
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about Coastal Road Dust Mitigation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Maharashtra Pollution Control Board (MPCB) has mandated the Brihanmumbai Municipal Corporation (BMC) to implement dust control measures at coastal road construction sites within two days. This includes covering loose earth, removing dust from barricades, and implementing a water-fogging system during material handling. |
Original sector | Transportation |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
