Coastal Virginia Offshore Wind South - 800 MW (CVOW South)
Sector: Wind • Location: Corolla, North Carolina, United States of America
Source: Dodge USA
800 MW offshore wind farm across almost 40,000 acres off the Outer Banks, enough capacity to power 200,000 homes. Prior project had proposed Sandbridge cable landing, community opposition. 35 nautical miles from the mouth of the Chesapeake Bay, 25 miles south of the Dominion Coastal Virginia Offshore Wind project
- Status
- Prospective
- Sector
- Wind, Commercial, Telecommunications, Raw Materials, Power Transmission, Residential, Power Generation (CCGT)
- Location
- Corolla, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Coastal Virginia Offshore Wind South - 800 MW (CVOW South)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 800 MW offshore wind farm across almost 40,000 acres off the Outer Banks, enough capacity to power 200,000 homes. Prior project had proposed Sandbridge cable landing, community opposition. 35 nautical miles from the mouth of the Chesapeake Bay, 25 miles south of the Dominion Coastal Virginia Offshore Wind project |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Corolla |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Commercial, Telecommunications, Raw Materials, Power Transmission, Residential, Power Generation (CCGT) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
