COB 0 Cliffmont ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
demo and replace second-floor bathroom flooring and tile at wall demo and replace common area flooring at first floor, replace tile at bath, replace entrance door, pour concrete pad at the entrance, create access hatch for crawling space also pour 2 concrete footing to support hatch. plumbing repair
- Status
- Prospective
- Sector
- Cement, Commercial, Government
- Location
- Roslindale, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about COB 0 Cliffmont ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | demo and replace second-floor bathroom flooring and tile at wall demo and replace common area flooring at first floor, replace tile at bath, replace entrance door, pour concrete pad at the entrance, create access hatch for crawling space also pour 2 concrete footing to support hatch. plumbing repair |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roslindale |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
