COB 30 Mildred AV
Open · Massachusetts
Source: City of Boston
The scope of work will consist of one (1) day to advance three (3) borings up to 25 feet using Geoprobe drilling methods. All borings will be completed as a 2 inch groundwater monitoring wells with approximately 10 foot screens and flush mount road boxes.
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- Mattapan, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about COB 30 Mildred AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The scope of work will consist of one (1) day to advance three (3) borings up to 25 feet using Geoprobe drilling methods. All borings will be completed as a 2 inch groundwater monitoring wells with approximately 10 foot screens and flush mount road boxes. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mattapan |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
