COB 5300 Washington ST
Open · Massachusetts
Source: City of Boston
Enclose the cavity above the kitchen cabinets, installing 1 5/8" metal framing between;&; then applying 5/8" gypsum wallboard;&; finish paint.Proposed soffits are 15" high x 144" long.; 61 units (3,5,6,7,8,10,11,12,13,14,15,16,20,21,22,23,24,25,26,27,28,29,30,31,32,36,37,38,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,57,58,59,60,61,62,63,64,65,66,67,68,39,70,71 &; 72)
- Status
- Prospective
- Sector
- Metal, Commercial, Government, Manufacturing (Industrial)
- Location
- West Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about COB 5300 Washington ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Enclose the cavity above the kitchen cabinets, installing 1 5/8" metal framing between;&; then applying 5/8" gypsum wallboard;&; finish paint.Proposed soffits are 15" high x 144" long.; 61 units (3,5,6,7,8,10,11,12,13,14,15,16,20,21,22,23,24,25,26,27,28,29,30,31,32,36,37,38,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,57,58,59,60,61,62,63,64,65,66,67,68,39,70,71 &; 72) |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | West Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
