Cochabamba - La Paz Transmission Line
One of 2,358 projects Taiyo tracks in Bolivia.
Source: Inter-American Development Bank (IADB)
The project's general objective is to strengthen the supply of electric power in the northern area of the National Interconnected System (SIN) and improve reliability. Its specific objective is to support the construction of a 275-km, 150-MW capacity, 230-kV transmission line from the Santiváñez substation (Cochabamba Department) to the La Cumbre substation (La Paz Department), including works con
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Bolivia
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about Cochabamba - La Paz Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project's general objective is to strengthen the supply of electric power in the northern area of the National Interconnected System (SIN) and improve reliability. Its specific objective is to support the construction of a 275-km, 150-MW capacity, 230-kV transmission line from the Santiváñez substation (Cochabamba Department) to the La Cumbre substation (La Paz Department), including works construction to expand both of these substations. |
Original sector | ENERGY |
Budget |
Location
Country | Bolivia |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
