Code House / Bruno Brandini Architects
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
Text description provided by the architects.Located in a gated community in the city of Birigüi, in the state of São Paulo, Code House stands out for the composition of its entrances: a main one, providing access to the living room, and a secondary one, serving as a passageway to the gourmet area. This creates the impression of two individual residences when viewed from the street. The client's re
- Status
- Closed
- Sector
- Road, Residential, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Code House / Bruno Brandini Architects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.Located in a gated community in the city of Birigüi, in the state of São Paulo, Code House stands out for the composition of its entrances: a main one, providing access to the living room, and a secondary one, serving as a passageway to the gourmet area. This creates the impression of two individual residences when viewed from the street. The client's requirement was to design a gourmet area completely detached from the rest of the construction. Creating this type of separation between the main volume and the gourmet space requires a considerable amount of available land to avoid tight spaces, which becomes a challenge when designing in a gated community, given that building regulations restrict the use of a significant portion of the lot. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Residential, Commercial |
Article published date | 2026-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects
- Auburn Avenue Historic and Cultural Information Project
- M.L. King Jr. Dr. Cycle Track
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
