logo
ProjectPlanning Schematics

CO/DOT: Harmony Road Widening - Phase 2A Timnath

One of 10,000+ projects Taiyo tracks in Colorado.

Source: Dodge

widen Harmony Road from 2 to 4 lanes with auxiliary lanes The proposed improvements included approximately 4 miles of road widening from 4 lanes to 8 lanes, removal and construction of concrete curb, gutter, sidewalk, commercial driveways and handicap ramps, precast concrete decorative soundwalls, storm drain system, water and sewer services, street lighting and deep lift asphalt paving, asphalt o

Status
Prospective
Sector
Water Supply and Storage, Cement, Road, Commercial, Waste Processing and Treatment, Car parking, Automotive
Location
Fort Collins, Colorado, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about CO/DOT: Harmony Road Widening - Phase 2A Timnath

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CO/DOT: Harmony Road Widening - Phase 2A Timnath” is an infrastructure initiative in the Water Supply and Storage sector, located in Fort Collins, Colorado, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

widen Harmony Road from 2 to 4 lanes with auxiliary lanes The proposed improvements included approximately 4 miles of road widening from 4 lanes to 8 lanes, removal and construction of concrete curb, gutter, sidewalk, commercial driveways and handicap ramps, precast concrete decorative soundwalls, storm drain system, water and sewer services, street lighting and deep lift asphalt paving, asphalt overlay and microsurfacing, and 7 intersections were completely updated with new signals and stree...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Fort Collins

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Commercial, Waste Processing and Treatment, Car parking, Automotive

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project