CO/DOT: I 25 Bridge Preventative Maintenance (CO 003)
Sector: Cable car • Location: Colorado, United States of America
Source: Dodge USA
I25 @ 58Th And 62Nd This Project Is Located On I-25 Mainline (Mp 215.5 To 215.7). Work Consists Of Bridge Preventative Maintenance Activities Including The Removal And Replacement Of Expansion Devices, Concrete Repairs To The Existing Bridge Deck, Bridge Wall Repair, Approach Roadway Repair, Application Of Thin Bonded Overlay (Polyester Concrete) And Associated Traffic Control
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | I25 @ 58Th And 62Nd This Project Is Located On I-25 Mainline (Mp 215.5 To 215.7). Work Consists Of Bridge Preventative Maintenance Activities Including The Removal And Replacement Of Expansion Devices, Concrete Repairs To The Existing Bridge Deck, Bridge Wall Repair, Approach Roadway Repair, Application Of Thin Bonded Overlay (Polyester Concrete) And Associated Traffic Control |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
