CO/DOT: I-76 Concrete Panel Replacements (CO 001)
Sector: Cement • Location: Sterling, Colorado, United States of America
Source: Dodge USA
This project consists of concrete panel replacements with diamond grinding on I-76 from milepost 132.9-149.3. Multiple median cross-overs will be constructed throughout this corridor to accommodate traffic. New sign replacements, guardrail upgrades, and final striping work are also included. The scope of work is for construction management, inspection services, materials testing and Public Informa
- Status
- Closed
- Sector
- Cement, Road, Mass Transit, Rail, Commercial
- Location
- Sterling, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CO/DOT: I-76 Concrete Panel Replacements (CO 001)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of concrete panel replacements with diamond grinding on I-76 from milepost 132.9-149.3. Multiple median cross-overs will be constructed throughout this corridor to accommodate traffic. New sign replacements, guardrail upgrades, and final striping work are also included. The scope of work is for construction management, inspection services, materials testing and Public Information management services for the I-76 Corridor improvements project. This project consists of wor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Sterling |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Mass Transit, Rail, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
