CO/DOT: Interstate 25 Overpasses Replacement
Planning schematics · Colorado · Last reported Sep 2025
Source: Dodge
project to improve a 1.5-mile stretch of Interstate 25 in Colorado Springs. Work includes replacing two overpasses at Ellston Street, repairing the bridge deck at Garden of the Gods Road, making drainage improvements, repaving, and lengthening acceleration and deceleration lanes between interchanges.
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Commercial
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CO/DOT: Interstate 25 Overpasses Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | project to improve a 1.5-mile stretch of Interstate 25 in Colorado Springs. Work includes replacing two overpasses at Ellston Street, repairing the bridge deck at Garden of the Gods Road, making drainage improvements, repaving, and lengthening acceleration and deceleration lanes between interchanges. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
