logo
ProjectConstruction

CO/DOT: Roadway Resurfacing (CO 001)

Construction · Colorado · Last reported Mar 2024

Source: Dodge USA

Work consists of constructing continuous auxiliary lanes in both direction of I-25 between exits 145 and 146, reconstructing and widening the Ellston St overpass structures, joint repair on the GOTG overpass structures, roadway resurfacing, curve cross slope corrections, drainage and water quality upgrades, ITS infrastructure replacements, and ramp metering modifications. I-25 Fillmore To Garden O

Status
Under Construction
Sector
Commercial, Water Supply and Storage, Bridge, Road, Waste Processing and Treatment
Location
Colorado Springs, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CO/DOT: Roadway Resurfacing (CO 001)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CO/DOT: Roadway Resurfacing (CO 001)” is an infrastructure initiative in the Commercial sector, located in Colorado Springs, Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work consists of constructing continuous auxiliary lanes in both direction of I-25 between exits 145 and 146, reconstructing and widening the Ellston St overpass structures, joint repair on the GOTG overpass structures, roadway resurfacing, curve cross slope corrections, drainage and water quality upgrades, ITS infrastructure replacements, and ramp metering modifications. I-25 Fillmore To Garden Of Gods Operational Improvements In Colorado Springs, Exits 145 To 146

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Colorado Springs

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Road, Waste Processing and Treatment

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project