CO/DOT: Sign Panel Replacement (CO 002)
One of 10,000+ projects Taiyo tracks in Colorado.
Source: Dodge USA
This project is located in Region 2 in various counties. Project work consists of removal and replacement of signs along US 24 between Divide and Chipita Park and Hwy 67D in Woodland Park in Teller County, along Hwy 16 & 85A in and around Fountain, along Hwy 105 in Monument & Palmer Lake, Highways 21B & 83 in and north of Colorado Springs in El Paso County
- Status
- Closed
- Sector
- Mass Transit, Commercial, Road, Rail, Car parking, Automotive
- Location
- Divide, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CO/DOT: Sign Panel Replacement (CO 002)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Design Development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is located in Region 2 in various counties. Project work consists of removal and replacement of signs along US 24 between Divide and Chipita Park and Hwy 67D in Woodland Park in Teller County, along Hwy 16 & 85A in and around Fountain, along Hwy 105 in Monument & Palmer Lake, Highways 21B & 83 in and north of Colorado Springs in El Paso County |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Divide |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Commercial, Road, Rail, Car parking, Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
