logo

Coffee Hollow Road Bridge Replacement

Sector: Bridge • Location: Peebles, Ohio, United States

Source: WCPO 9 Cincinnati

Project
Planned

The project involves replacing the low-water bridge over Scioto Brush Creek on Coffee Hollow Road in Adams County, Ohio. The current bridge floods frequently, cutting off access to a rural neighborhood and causing safety concerns. The new bridge will be built 8 feet higher than the current one to prevent flooding issues. Construction is planned to start at the end of summer 2026 and is expected to

Status
Prospective
Sector
Bridge, Water Supply and Storage, Commercial, Residential
Location
Peebles, Ohio, United States of America
Updated
22 Jul 2026
Source
WCPO 9 Cincinnati

ConstructChat

Ask ConstructChat about Coffee Hollow Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Coffee Hollow Road Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Peebles, Ohio, United States. Taiyo aggregates data on it from WCPO 9 Cincinnati.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves replacing the low-water bridge over Scioto Brush Creek on Coffee Hollow Road in Adams County, Ohio. The current bridge floods frequently, cutting off access to a rural neighborhood and causing safety concerns. The new bridge will be built 8 feet higher than the current one to prevent flooding issues. Construction is planned to start at the end of summer 2026 and is expected to take six months, after which the original bridge will be removed.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Peebles

Source

Source

WCPO 9 Cincinnati

URL

More Details

Record type

Project

Sector

Bridge, Water Supply and Storage, Commercial, Residential

Article published date

2026-05-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project