Coffs Harbour Water Treatment Plant, New South Wales

Sector: Chemical (Industrial) • Location: Australia

Source: Water Technology

Project
Closed

Coffs Harbour water treatment plant (WTP) is located at Karangi, a suburb in the city of Coffs Harbour, New South Wales. Since the project was estimated to require an investment of more than $30m, it was categorised as a 'major project'. The new regional water supply involved extraction from a different source, and storage in the new dam. Coffs Harbour Council wanted to ensure the water source wou

Project Information FAQ

Project Information

3 Q
The project “Coffs Harbour Water Treatment Plant, New South Wales” is an infrastructure initiative in the Chemical (Industrial) sector, located in Australia. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Coffs Harbour water treatment plant (WTP) is located at Karangi, a suburb in the city of Coffs Harbour, New South Wales. Since the project was estimated to require an investment of more than $30m, it was categorised as a 'major project'. The new regional water supply involved extraction from a different source, and storage in the new dam. Coffs Harbour Council wanted to ensure the water source would meet the high quality of water from the Orara River and Karangi Dam. Work on the construction of a filtered water channel and UV treated water channel began in early 2008. Coffs Harbour water treatment plant (WTP) is located at Karangi, a suburb in the city of Coffs Harbour, New South Wales (NSW), Australia. The plant was officially opened in June 2009 with an investment of $60m. It can treat 42 megalitres of water a day. The capacity, however, can be increased to 56 megalitres a day in future. Since the project was estimated to require a capital investment of more than $30m, it was categorised as a ‘major project’ under Part 3A of the environment planning and assessment act 1979, NSW. As a result, an environmental assessment (EA) of the project was undertaken by consulting services firm GHD. As part of the EA, a visual assessment (VA) was also carried out to investigate the potential visual impacts of the proposed plant on the surrounding environment. Adjoining property owners were consulted during the design process, to input to the landscaping to enhance the visual amenity. Coffs Harbour’s local water supply is of a high standard, but several years of drought and a growing population highlighted the need for long-term planning. Coffs Harbour City Council formed a partnership with the neighbouring Clarence Valley Council and the NSW Government to develop the $180m regional water supply project, which included a 30,000 megalitre Shannon Creek Dam, 90km pipeline and associated infrastructure along with water efficiency education initiatives, to provide a secure water supply until 2030 and beyond. The new regional water supply involved extraction from a different source, and storage in the new dam. Coffs Harbour Council wanted to ensure any new water source would continue to meet the high quality of water from the local Orara River and Karangi Dam, as well as the prevailing Australian drinking water guidelines and NSW Health Department requirements. The city initially used to get water supply from Karangi Dam. In the past, the dam was supplied by inflow only from the Orara River catchment area. The sourced water was treated by aerating it at the dam itself, to remove iron and manganese substances. The treated water was stabilised by adding lime and carbon dioxide and was chlorinated. The plant has five main components. The control building is built on the southern entrance of the site. Adjacent to the control building is the dissolved air filtration and flotation (DAFF) building and a chemical plant. Treated water storage tanks, a sludge de-watering building and a treated water pump station are built on the north-eastern boundary of the site. Construction of the new water filtration plant at Karangi commenced in October 2007. A risk assessment and a hazard and operability study (HAZOP) were carried out prior to the construction. A temporary building to serve 80 workers during peak construction period was erected in November 2007. Work on the construction of a filtered water channel and UV treated water channel began in early 2008. The control building and an education centre were completed in late 2008. Water from the Karangi Dam is first gravity-fed to the plant. It is then stabilised by adding lime and carbon dioxide. A dissolved air flotation and filtration process is applied to remove contaminants from the stabilised water. Water is disinfected through ultra violet light irradiation and chlorination. The CHCC was the proponent of the project. The design and construction was undertaken by Coffs Infrastructure Alliance, comprising CHCC and a joint venture between Abigroup and John Holland. The process design was by GHD. The electrical and mechanical expertise was provided by CNF&A and Aquatec Maxcon.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data