Cogeneration System Improvements REBID
Sector: Power Generation (CCGT) • Location: Antioch, California, United States of America
Source: Dodge USA
Delta Diablo (District) is seeking bids from qualified firms interested in providing construction for the Cogeneration System Improvements Project (Project). The Contractor will work in close coordination with the Owner s Representative and/or Construction Representative to administer the construction contract for the Project.Demolition of the existing and replacement with a new cogeneration engin
- Status
- Prospective
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Antioch, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cogeneration System Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Delta Diablo (District) is seeking bids from qualified firms interested in providing construction for the Cogeneration System Improvements Project (Project). The Contractor will work in close coordination with the Owner s Representative and/or Construction Representative to administer the construction contract for the Project.Demolition of the existing and replacement with a new cogeneration engine, digester gas conditioning equipment, exhaust systems, and boiler Upgrades to electrical, contr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Antioch |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
