logo
ProjectPending

COJ Debt 2

Pending · South Africa

Source: International Finance Corporation (IFC)

The City of Johannesburg Metropolitan Municipality (CoJ or “the City”) is the largest municipality in South Africa based on revenue generation and has an estimated population of 6 million (approximately 10% of the population of South Africa) (). IFC first engaged with CoJ in 2004 through a bond issuance and a subsequent loan in 2023 to support the City’s FY22/23 capital

Status
Prospective
Sector
Water Supply and Storage, Road, Government
Location
South Africa
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about COJ Debt 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “COJ Debt 2” is an infrastructure initiative in the Water Supply and Storage sector, located in South Africa. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Johannesburg Metropolitan Municipality (CoJ or “the City”) is the largest municipality in South Africa based on revenue generation and has an estimated population of 6 million (approximately 10% of the population of South Africa) (https://www.joburg.org.za/). IFC first engaged with CoJ in 2004 through a bond issuance and a subsequent loan in 2023 to support the City’s FY22/23 capital expenditure projects (https://disclosures.ifc.org/project-detail/ESRS/46703/coj-debt). IFC is considering a further loan to support the City's non-revenue water (NRW) reduction strategy ("the project"). Johannesburg Water which is part of CoJ will be the implementing agency for the project the scope of which consists exclusively of brownfield and rehabilitation works. Specifically this includes; (i) replacement of existing water pipelines; (ii) a city-wide bulk and customer metering installation program; and (iii) refurbishment and limited capacity enhancement of existing water reservoirs. Activities consist of internal repairs, installation of additional reservoir capacity including installation of liners, and pipe and valve replacement. Eligible activities will be implemented entirely within the existing as-built physical footprint of operational assets, or, for pipeline replacements, within established municipal road reserves and servitudes under the City's ownership. Where physical additions occur to existing operational assets they will be situated on vacant and unencumbered land, devoid of any formal or informal use. Additions will be contiguous with existing asset types, requiring no new ancillary facilities or access routes, and will not impact environmentally sensitive areas.Works associated with the project will be constructed by contractors appointed by the City via a tender process and thereafter managed by Johannesburg Water.

Original sector

W-BC - Municipal Finance - Water, Wastewater, District Heating, and Waste [Project only]

Location

Country

South Africa

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2026-04-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project