Colchester Waterline Extension
Bid results · New York · Last reported Oct 2024
Source: Dodge USA
Base Bid Work for Contract TC1-G-24 General consists of, but is not limited to, the installation of approximately 2,000 feet of Transmission Main, 750 feet of Service line, 4 Resilient Seat Gate Valves, 1 Flush Hydrant, 5 Service Connections with Curb Stops, and 1 Meter Pit. A NYSDOT Highway Work Permit will be required.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Raw Materials
- Location
- Downsville, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Colchester Waterline Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Base Bid Work for Contract TC1-G-24 General consists of, but is not limited to, the installation of approximately 2,000 feet of Transmission Main, 750 feet of Service line, 4 Resilient Seat Gate Valves, 1 Flush Hydrant, 5 Service Connections with Curb Stops, and 1 Meter Pit. A NYSDOT Highway Work Permit will be required. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Downsville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Raw Materials |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
