Cold Creek Solar + Storage Project
The owner, status and timeline of this project. A free account opens every field.
Source: Mercom Capital Group
The Cold Creek project is a hybrid solar-plus-storage project with 430 MWac of solar generation capacity and 340 MWh of battery energy storage systems (BESS). Construction began following the notice to proceed in March 2026, with commercial operation expected in summer 2028.
- Status
- Under Construction
- Sector
- Energy Storage, Solar, Commercial
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Mercom Capital Group
ConstructChat
Ask ConstructChat about Cold Creek Solar + Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Cold Creek project is a hybrid solar-plus-storage project with 430 MWac of solar generation capacity and 340 MWh of battery energy storage systems (BESS). Construction began following the notice to proceed in March 2026, with commercial operation expected in summer 2028. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Mercom Capital Group |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Solar, Commercial |
Article published date | 2026-03-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
