Coleambally Battery Energy Storage System (BESS) Project
Sector: Power Generation (CCGT) • Location: Coleambally, New South Wales, Australia
Source: Asian Power
The Coleambally BESS is a 100 megawatt (MW) / 400 megawatt-hour lithium-ion battery system designed to provide four hours of energy storage. It is located 9 kilometres northeast of Coleambally in New South Wales, adjacent to Transgrid’s existing Coleambally substation and near the 150 MW Coleambally Solar Farm.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Energy Storage, Raw Materials, Solar, Warehouse
- Location
- Coleambally, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- Asian Power
ConstructChat
Ask ConstructChat about Coleambally Battery Energy Storage System (BESS) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Coleambally BESS is a 100 megawatt (MW) / 400 megawatt-hour lithium-ion battery system designed to provide four hours of energy storage. It is located 9 kilometres northeast of Coleambally in New South Wales, adjacent to Transgrid’s existing Coleambally substation and near the 150 MW Coleambally Solar Farm. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
City | Coleambally |
Source
Source | Asian Power |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage, Raw Materials, Solar, Warehouse |
Article published date | 2025-05-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
