Colima - Villa de Alvarez Wastewater Treatment Plant Phase II

Sector: Water Supply and Storage • Location: Mexico

Source: World Bank Group

Project
Active

In February 2006, the sponsor had established the special purpose company Ecosistemas de Colima S.A. de C.V. to lead the project. The treatment plant was initially established with 800 liters/second or 69.1 m3/day in capacity (Phase I), which was later increased to 1200 liters/second or 103.7 m3/day (Phase II). A total of 300,000 people benefited from the project.

In December 2005, the Colombian

Status
Prospective
Sector
Water Supply and Storage, Commercial, Government, Waste Processing and Treatment
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Colima - Villa de Alvarez Wastewater Treatment Plant Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Colima - Villa de Alvarez Wastewater Treatment Plant Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In February 2006, the sponsor had established the special purpose company Ecosistemas de Colima S.A. de C.V. to lead the project. The treatment plant was initially established with 800 liters/second or 69.1 m3/day in capacity (Phase I), which was later increased to 1200 liters/second or 103.7 m3/day (Phase II). A total of 300,000 people benefited from the project. In December 2005, the Colombian company Tecnologica Intercontinental (Ticsa) was awarded the 20-year contract to build and operate the wastewater treatment plant named PTAR Colima (Colima, state of Colima). The bidding criteria was the lowest cost per m3 of treated wastewater, and three other bidders took part in the bidding process established by the state government: Hidrobiotecnologia, Servicios y Construcciones de la Laguna and Corporacion Hidroindustrial. The first phase involved an investment of US$ 28.1 million (Pesos 305.2 million) and became operational in 2007 (ID# 8691). The investment in the second phase was estimated at US$ 19.3 million (Pesos 246 million), of which 70% was financed with a federal government grant. Construction works commenced in 2011 and were concluded in March 2013. In May 2013, the Colombian company EPM acquired 80% of Ticsa's shares for US$ 113 million. The remaining 20% of the shares were held by the Mexican family Primelles.

Original sector

Water and sewerage

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government, Waste Processing and Treatment

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project