Coliseum Lake Weir Replacement
Sector: Cement • Location: Hampton, Virginia, United States of America
Source: Dodge USA
The Work includes but is not limited to: 1. Preparation of creek bed for pouring concrete including the slopes and dimensions as seen on the Contract Documents. 2. Installation of the concrete apron with baffles in a configuration as shown on the Contract Documents. 3. Preparation of all required submittals specified in Division I of HRPDC specifications.
- Status
- Closed
- Sector
- Cement, Government, Commercial, Manufacturing (Industrial)
- Location
- Hampton, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Coliseum Lake Weir Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes but is not limited to: 1. Preparation of creek bed for pouring concrete including the slopes and dimensions as seen on the Contract Documents. 2. Installation of the concrete apron with baffles in a configuration as shown on the Contract Documents. 3. Preparation of all required submittals specified in Division I of HRPDC specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Hampton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
