Coliseum Outfall Upgrades
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge
This project is for the design and construct upgrades to 4600 linear feet from 6.6" and 8" sewer mains to 12" and 15" from the Coliseum south to the South Buffalo Creek outfall. The project will go from the Coliseum south to South Buffalo Creek outfall near Murrayhill Rd. SSO's along the line over the previous 5 years, additional coliseum flow from new pools, flow monitoring in 2018 revealed that
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
- Location
- Greensboro, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Coliseum Outfall Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project is for the design and construct upgrades to 4600 linear feet from 6.6" and 8" sewer mains to 12" and 15" from the Coliseum south to the South Buffalo Creek outfall. The project will go from the Coliseum south to South Buffalo Creek outfall near Murrayhill Rd. SSO's along the line over the previous 5 years, additional coliseum flow from new pools, flow monitoring in 2018 revealed that flow restrictors and process rules are not always being followed at the Coliseum which has led to... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Greensboro |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
