Collector Streets Sidewalks Construction
Sector: Automotive • Location: Windsor, Connecticut, United States of America
Source: Dodge
The 2004 Plan of Conservation and Development recommends that sidewalks be provided on at least one side of all collector streets. This is not only to encourage walking to improve fitness, but also to reduce vehicle emissions by allowing residents to safely walk to destinations. In many cases, subdivisions have been built with sidewalks leading to streets with no walks. Approximately 20 miles of s
- Status
- Prospective
- Sector
- Automotive, Car parking, Road, Government, Commercial
- Location
- Windsor, Connecticut, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Collector Streets Sidewalks Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The 2004 Plan of Conservation and Development recommends that sidewalks be provided on at least one side of all collector streets. This is not only to encourage walking to improve fitness, but also to reduce vehicle emissions by allowing residents to safely walk to destinations. In many cases, subdivisions have been built with sidewalks leading to streets with no walks. Approximately 20 miles of sidewalks need to be constructed along collector streets to provide for walks on one side. Streets... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Windsor |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Automotive, Car parking, Road, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
