College & Shango Hall Renovation
Closed · New York · Last reported Jan 2025
Source: Dodge
full replacement of all interior finishes and components, all MEP systems, roof and elevator, as well as the abatement of hazardous materials. Consultant will be required to determine the optimum phasing of construction based on available funding and potential surge space. The building design and all new components and systems will comply with the new SUCF Directive 1B-2, Net Zero Carbon New Build
- Status
- Closed
- Sector
- Education, Commercial
- Location
- New Paltz, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about College & Shango Hall Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | full replacement of all interior finishes and components, all MEP systems, roof and elevator, as well as the abatement of hazardous materials. Consultant will be required to determine the optimum phasing of construction based on available funding and potential surge space. The building design and all new components and systems will comply with the new SUCF Directive 1B-2, Net Zero Carbon New Buildings and Deep Energy Retrofits of Existing Buildings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New Paltz |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Education, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
