logo

College Creek Inlet Hydrological Study to develop safety alternative

Sector: Advanced Electronics • Location: United States of America

Source: Grants.gov

Project
Archived

Task 1:  Shoreline Digitizing, Shoreline Change, and Bathymetric Survey For this task, the 2017 shoreline will be digitized and the rates of change calculated for several time periods. It will include the inlet, nearshore channel, and sandbar.  Shorelines, shoreline change data, and bathymetric data will be available in ArcGIS format with appropriate metadata. Task 2:  Numerical Modeling To unders

Project Information FAQ

Project Information

5 Q
The project “College Creek Inlet Hydrological Study to develop safety alternative” is an infrastructure initiative in the Advanced Electronics sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Task 1:  Shoreline Digitizing, Shoreline Change, and Bathymetric Survey For this task, the 2017 shoreline will be digitized and the rates of change calculated for several time periods. It will include the inlet, nearshore channel, and sandbar.  Shorelines, shoreline change data, and bathymetric data will be available in ArcGIS format with appropriate metadata. Task 2:  Numerical Modeling To understand the cause of the strong rip current and to investigate the approach to change this dynamic condition, a numerical model will simulate the currents in this region under different tide and freshwater discharge conditions.  Once the model is calibrated, three scenarios testing different channel configurations will be created and the changes in flow conditions will be determined. Task 3:  Reporting Progress reports will be provided as draft and final reports. VIMS will address NPS’ comments and revise the complete draft report.  The final report will be digital in Adobe Acrobat format.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data