College Hill Reservoir Outlet & Pipeline Project
Sector: Power Generation (CCGT) • Location: San Franscisco, California, United States of America
Source: SF Water Power System
The San Francisco Public Utilities Commission (SFPUC) and its contractor (Ranger Pipelines) is replacing a portion of an existing large diameter water transmission pipeline (College Hill Pipeline) which runs from the College Hill Reservoir; through SFPUC’s Right of Way and across the unpaved portion of Prospect Avenue to Cortland Avenue. Additional new pipeline connections will also be made on Sa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The San Francisco Public Utilities Commission (SFPUC) and its contractor (Ranger Pipelines) is replacing a portion of an existing large diameter water transmission pipeline (College Hill Pipeline) which runs from the College Hill Reservoir; through SFPUC’s Right of Way and across the unpaved portion of Prospect Avenue to Cortland Avenue. Additional new pipeline connections will also be made on Santa Marina Street from Prospect to Mission Street with an upgrade to the fire hydrant connection on Gladys Street at Santa Marina. The project also includes the installation of new reservoir roof vaults, improved road access (within the reservoir) and electrical upgrades. Coyotes are active in and around College Hill Reservoir. The SFPUC is prohibited from interfering with coyotes and other wildlife and have posted signage along the reservoir fence, requesting that residents do not interact with or feed the coyotes. For more information about San Francisco's coyote policies, please check the SF Animal Care and Control website.CONSTRUCTION LOOK-AHEADWeek of June 10thValve vault work: Inside Reservoir groundsRoof replacement: Inside Reservoir groundsWeek of June 17thValve vault work: Inside Reservoir groundsRoof replacement: Inside Reservoir groundsWeek of June 24thRoof replacement: Inside Reservoir groundsValve vault pipeline work: Inside Reservoir groundsMap of project area: |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
