logo

Colley Road Lift Station

Sector: Water Supply and Storage • Location: Beloit, Wisconsin, United States of America

Source: Dodge USA

Project
Closed

APPROXIMATELY: one new 30-foot deep wet well with two pumps, a valve vault, and an exterior control panel with provisions for connection to a portable generator. The work also includes installation of approximately 3,000 feet of directionally drilled 6-inch force main and a stub influent sewer to the wet well. Other work includes related sitework improvements, electrical, instrumentation/controls,

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Power Generation (CCGT), Road, Commercial
Location
Beloit, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Colley Road Lift Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Colley Road Lift Station” is an infrastructure initiative in the Water Supply and Storage sector, located in Beloit, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

APPROXIMATELY: one new 30-foot deep wet well with two pumps, a valve vault, and an exterior control panel with provisions for connection to a portable generator. The work also includes installation of approximately 3,000 feet of directionally drilled 6-inch force main and a stub influent sewer to the wet well. Other work includes related sitework improvements, electrical, instrumentation/controls, surface restoration, and ancillary work required to complete the new lift station and force main.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Beloit

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Power Generation (CCGT), Road, Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project