logo

Colombo Environmental Improvement

Sector: Road • Location: Sri Lanka

Source: World Bank Group

Project
Closed

The overall objective of the Colombo Environmental Improvement Project is to contribute to a sustainable environment for the long term economic and social development of the Colombo Metropolitan Area (CMA). Specifically objectives are as follows: 1) improve muncipal solid waste management and services in the Colombo Municipal Council (CMC) and participating local authorities; 2) reduce wastewater

Project Information FAQ

Project Information

5 Q
The project “Colombo Environmental Improvement” is an infrastructure initiative in the Road sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The overall objective of the Colombo Environmental Improvement Project is to contribute to a sustainable environment for the long term economic and social development of the Colombo Metropolitan Area (CMA). Specifically objectives are as follows: 1) improve muncipal solid waste management and services in the Colombo Municipal Council (CMC) and participating local authorities; 2) reduce wastewater pollution in the Beira Lake catchment area and selected industrial zones; 3) develop the capabilities of local governments and institutions to plan and manage municipal services in a sustainable, environmentally beneficial manner; and 4) assist in mobilizing private participation in the development and operation of urban infrastructure services. The project comprises four major components. The first is a municipal solid waste management component which will support the construction of a sanitary landfill, construction of a 100 tons/day capacity compost plant the Welisara landfill, provision of potable water supply and other infrastructure for the communtiy residing adjacent to the landfill site and the purchase of equipment and vehicles for safe collection, transport and final disposal of hospital wastes at the Welisara landfill. The second component supports a wastewater collection system for construction of a sewer network in each of the two industrialized zones, Ratmalana and Ekala/Ja-Ela, to collect and carry industrial and domestic wastewaters to two separate wastewater treatment plants built by the private sector. The third component supports a pollution control program in the Beira Lake catchment for the interception of unauthorized wastewater outlets now discharging to the storm drainage system and connecting them to existing sewerage system and reduction of sewerage overflows through cleaning sewer lines, rehabilitating pumping station, and adding a sewer line along the northwest bank of the East Lake. The final component is a technical assistance component consisting of project preparation assistance, project implementation support, technical assistance to the CMC and technical assistance to the Urban Development Authority.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data