Colombo Environmental Improvement
One of 10,000+ projects Taiyo tracks in Sri Lanka.
Source: World Bank Group
The overall objective of the Colombo Environmental Improvement Project is to contribute to a sustainable environment for the long term economic and social development of the Colombo Metropolitan Area (CMA). Specifically objectives are as follows: 1) improve muncipal solid waste management and services in the Colombo Municipal Council (CMC) and participating local authorities; 2) reduce wastewater
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Automotive, Biomass, Hospital, Manufacturing (Industrial), Waste Processing and Treatment, Government
- Location
- Sri Lanka
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Colombo Environmental Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall objective of the Colombo Environmental Improvement Project is to contribute to a sustainable environment for the long term economic and social development of the Colombo Metropolitan Area (CMA). Specifically objectives are as follows: 1) improve muncipal solid waste management and services in the Colombo Municipal Council (CMC) and participating local authorities; 2) reduce wastewater pollution in the Beira Lake catchment area and selected industrial zones; 3) develop the capabilities of local governments and institutions to plan and manage municipal services in a sustainable, environmentally beneficial manner; and 4) assist in mobilizing private participation in the development and operation of urban infrastructure services. The project comprises four major components. The first is a municipal solid waste management component which will support the construction of a sanitary landfill, construction of a 100 tons/day capacity compost plant the Welisara landfill, provision of potable water supply and other infrastructure for the communtiy residing adjacent to the landfill site and the purchase of equipment and vehicles for safe collection, transport and final disposal of hospital wastes at the Welisara landfill. The second component supports a wastewater collection system for construction of a sewer network in each of the two industrialized zones, Ratmalana and Ekala/Ja-Ela, to collect and carry industrial and domestic wastewaters to two separate wastewater treatment plants built by the private sector. The third component supports a pollution control program in the Beira Lake catchment for the interception of unauthorized wastewater outlets now discharging to the storm drainage system and connecting them to existing sewerage system and reduction of sewerage overflows through cleaning sewer lines, rehabilitating pumping station, and adding a sewer line along the northwest bank of the East Lake. The final component is a technical assistance component consisting of project preparation assistance, project implementation support, technical assistance to the CMC and technical assistance to the Urban Development Authority. |
Original sector | FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Sri Lanka |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Automotive, Biomass, Hospital, Manufacturing (Industrial), Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
