Colony Main Canal Lorraine Street Bridge Replacement
Sector: Water Supply and Storage • Location: Dos Palos, California, United States of America
Source: Dodge USA
The work includes: Scarifying, trimming, and placement of compacted embankment within the existing segment of the Colony Main Canal; placement of unreinforced concrete lining; demolition and removal of the existing Lorraine Street Crossing; installation of new rubber gasket reinforced concrete pipe culverts, reinforced concrete headwalls, sidewalk, curb and gutter, and asphalt roadway.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Bridge, Car parking, Automotive, Road
- Location
- Dos Palos, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Colony Main Canal Lorraine Street Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes: Scarifying, trimming, and placement of compacted embankment within the existing segment of the Colony Main Canal; placement of unreinforced concrete lining; demolition and removal of the existing Lorraine Street Crossing; installation of new rubber gasket reinforced concrete pipe culverts, reinforced concrete headwalls, sidewalk, curb and gutter, and asphalt roadway. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Dos Palos |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Bridge, Car parking, Automotive, Road |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
