logo

Colosseum Gold Project Feasibility Study

Sector: Metal • Location: California, United States

Source: The West Australian

Project
Planned

Dateline Resources has initiated a bankable feasibility study for its 1.1-million-ounce Colosseum gold project in California, aiming to establish a high-margin gold operation with a processing capacity of 2 million tonnes per annum to yield 75,000 ounces of gold annually over an 8.5-year mine life.

Status
Prospective
Sector
Metal
Location
California, United States of America
Updated
22 Jul 2026
Source
The West Australian

ConstructChat

Ask ConstructChat about Colosseum Gold Project Feasibility Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Colosseum Gold Project Feasibility Study” is an infrastructure initiative in the Metal sector, located in California, United States. Taiyo aggregates data on it from The West Australian.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Dateline Resources has initiated a bankable feasibility study for its 1.1-million-ounce Colosseum gold project in California, aiming to establish a high-margin gold operation with a processing capacity of 2 million tonnes per annum to yield 75,000 ounces of gold annually over an 8.5-year mine life.

Original sector

Mining

Budget

Location

Country

United States of America (USA)

State

California

Source

Source

The West Australian

URL

More Details

Record type

Project

Sector

Metal

Article published date

2025-04-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project