Colosseum Gold Project
Sector: Mining • Location: California, United States
Source: Geomechanics.io
Dateline Resources’ 100%-owned Colosseum gold project in California’s Walker Lane Trend with a bankable feasibility study outlining 573,000 oz production over 10.4 years, peak output of 102,000 oz in year six, and a US$313 million capital expenditure. The project is located within the Mojave National Preserve and near MP Materials’ Mountain Pass rare earths mine, indicating potential for co-locate
- Status
- Prospective
- Sector
- Mining
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Geomechanics.io
ConstructChat
Ask ConstructChat about Colosseum Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dateline Resources’ 100%-owned Colosseum gold project in California’s Walker Lane Trend with a bankable feasibility study outlining 573,000 oz production over 10.4 years, peak output of 102,000 oz in year six, and a US$313 million capital expenditure. The project is located within the Mojave National Preserve and near MP Materials’ Mountain Pass rare earths mine, indicating potential for co-located rare earth minerals. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Geomechanics.io |
URL |
More Details
Record type | Project |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
