Colosseum Solar Power Project
Sector: Raw Materials • Location: Bulgaria
Source: Balkan Green Energy News
PPC Group is constructing a 165 MW solar farm in Stara Zagora, Bulgaria, which will include a battery energy storage system (BESS) of 25 MW and a capacity of 55 MWh. The project aims to generate over 265 GWh annually, enough to power more than 45,000 households.
- Status
- Under Construction
- Sector
- Raw Materials, Solar, Power Generation (CCGT), Energy Storage
- Location
- Bulgaria
- Updated
- 22 Jul 2026
- Source
- Balkan Green Energy News
ConstructChat
Ask ConstructChat about Colosseum Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PPC Group is constructing a 165 MW solar farm in Stara Zagora, Bulgaria, which will include a battery energy storage system (BESS) of 25 MW and a capacity of 55 MWh. The project aims to generate over 265 GWh annually, enough to power more than 45,000 households. |
Original sector | Energy |
Location
Country | Bulgaria |
Source
Source | Balkan Green Energy News |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Solar, Power Generation (CCGT), Energy Storage |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
