Colossus 2 Data Center
Sector: Water Supply and Storage • Location: Memphis, Tennessee, United States
Source: AOL
Colossus 2 is xAI's second data center in the Memphis area, located at 5420 Tulane Road in Memphis' Whitehaven neighborhood. The site covers 186.13 acres purchased for $79.9 million. The data center is described by Elon Musk as the "first gigawatt AI training supercluster." A construction permit was filed in March 2025 for a 312,356-square-foot building with an estimated construction cost of $659.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Data Center, Road, Commercial
- Location
- Memphis, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- AOL
ConstructChat
Ask ConstructChat about Colossus 2 Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Colossus 2 is xAI's second data center in the Memphis area, located at 5420 Tulane Road in Memphis' Whitehaven neighborhood. The site covers 186.13 acres purchased for $79.9 million. The data center is described by Elon Musk as the "first gigawatt AI training supercluster." A construction permit was filed in March 2025 for a 312,356-square-foot building with an estimated construction cost of $659.3 million. |
Original sector | Data Center |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Memphis |
Source
Source | AOL |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Data Center, Road, Commercial |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Union Power Project El Dorado AR
- Queen Elizabeth Way Widening
- Kosciuszko Bridge Replacement Project, New York, US
- Route 141 Improvement, St. Louis, Missouri
- Virginia’s Smart Road
- SR539 Guide Meridian Ten Mile Road Roundabouts, USA
- Frederick Douglass-Susan B Anthony Memorial Bridge (formerly Troup Howell)
- Gilmerton Bridge Replacement Project
