logo

Colquitz Bridge Widening

Sector: Road • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

This project involves widening, retrofitting, and renewal of two Highway 1 bridges over the Colquitz River with the objective of extending a dedicated shoulder bus lane between Tillicum Road and Admirals-McKenzie Interchange in each direction. The bridges, locally known as the Burnside bridges, are located in Saanich, BC. The Burnside Bridges are currently a constraint which prevents continuation

Project Information FAQ

Project Information

4 Q
The project “Colquitz Bridge Widening” is an infrastructure initiative in the Road sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project involves widening, retrofitting, and renewal of two Highway 1 bridges over the Colquitz River with the objective of extending a dedicated shoulder bus lane between Tillicum Road and Admirals-McKenzie Interchange in each direction. The bridges, locally known as the Burnside bridges, are located in Saanich, BC. The Burnside Bridges are currently a constraint which prevents continuation of adjacent dedicated shoulder bus lanes. Major project deliverables include functional and detailed design packages, and a tender package for the bridge improvements, as well as supporting engineering and environmental, reviews and assessments. Engagement with District of Saanich, local Indigenous groups, and BC Transit is ongoing. Construction scope will include demolition of existing walkways to facilitate construction of new girder, pier, and deck facilities; installation of temporary barriers to accommodate lane shifts; construction of deck extension and overlay; and milling and paving. The project will reduce congestion, and improve safety, mobility and reliability of public transportation by creating continuous transit facilities in both directions from Downtown Victoria to the McKenzie Interchange. Increasing transit capacity encourages more transit users thus reducing congestion and GHG emissions through mode-shift and distance travelled by low-occupancy GHG emitting vehicles.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data