logo

Columbia City South Trail, NLT 3-04

Sector: Mass Transit • Location: Columbia City, Indiana, United States of America

Source: Dodge USA

Project
Closed

The City of Columbia City intends to construct a 10' wide pedestrian trail from the High School along SR-9 and various local roadways to the existing Blue River Trail at Main Street (SR-9). The work includes, but is not limited to, clearing right of way, asphalt and concrete trail construction, driveway improvements, signage, pedestrian bridge, erosion control, and site restoration as specified in

Status
Closed
Sector
Mass Transit, Commercial, Road, Rail, Cement, Bridge, Car parking, Government, Automotive
Location
Columbia City, Indiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Columbia City South Trail, NLT 3-04

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Columbia City South Trail, NLT 3-04” is an infrastructure initiative in the Mass Transit sector, located in Columbia City, Indiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Columbia City intends to construct a 10' wide pedestrian trail from the High School along SR-9 and various local roadways to the existing Blue River Trail at Main Street (SR-9). The work includes, but is not limited to, clearing right of way, asphalt and concrete trail construction, driveway improvements, signage, pedestrian bridge, erosion control, and site restoration as specified in the Contract Documents. All applicable laws, ordinances, and the rules and regulations of all au...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Indiana

City

Columbia City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Mass Transit, Commercial, Road, Rail, Cement, Bridge, Car parking, Government, Automotive

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project