logo

Columbus 69-2 Circuit Improvements

Sector: Solar • Location: Columbus, Ohio, United States of America

Source: Dodge

Project
Closed

The 69-2 Circuit Improvements project will upgrade a 50 year old transmission circuit. This circuit is 9.7 miles long and stretches from our Southerly Substation to our Jackson Pike Substation. Some of the line has already been upgraded, but 8.3 miles of this circuit still need to be reconductored with newer, larger wire to extend the useful life of this circuit and to provide additional capacity

Status
Closed
Sector
Solar, Government, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
Location
Columbus, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Columbus 69-2 Circuit Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Columbus 69-2 Circuit Improvements” is an infrastructure initiative in the Solar sector, located in Columbus, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 69-2 Circuit Improvements project will upgrade a 50 year old transmission circuit. This circuit is 9.7 miles long and stretches from our Southerly Substation to our Jackson Pike Substation. Some of the line has already been upgraded, but 8.3 miles of this circuit still need to be reconductored with newer, larger wire to extend the useful life of this circuit and to provide additional capacity for increased current from a planned solar field. City of Columbus MBE/WBE Goal: 10%

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Columbus

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Solar, Government, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project