Columbus City - Pavement Maintenance Program REBID
Sector: Water Supply and Storage • Location: Columbus, Ohio, United States of America
Source: Dodge
procure a Service Contract to replace parking lot and driveway pavement of all City Buildings. The City of Columbus (Finance and Management Division) maintains over 100 buildings with all types of concrete and asphalt parking lots, driveways, sidewalks, curbs, etc. The primary objective of the Pavement Replacement Program is to ensure the longevity, structural integrity, and optimal performance of
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Columbus City - Pavement Maintenance Program REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | procure a Service Contract to replace parking lot and driveway pavement of all City Buildings. The City of Columbus (Finance and Management Division) maintains over 100 buildings with all types of concrete and asphalt parking lots, driveways, sidewalks, curbs, etc. The primary objective of the Pavement Replacement Program is to ensure the longevity, structural integrity, and optimal performance of the pavement systems. This program is intended to proactively identify and address potential iss... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
