logo
ProjectIn Progress

Columbus Drive Shared Use Path

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The construction of Columbus Drive - Wishingwell Road to Wexford Street Shared-use Path (SUP) consists of upgrading the existing sidewalk (300 meters) on the East side of Columbus Drive from just North of Wishingwell Road to Wexford Street. This will connect the existing SUP’s on either end that were constructed previously for an active transportation route comfortable for use by people of all age

Status
Under Construction
Sector
Road, Car parking, Government, Automotive
Location
Newfoundland and Labrador, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Columbus Drive Shared Use Path

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Columbus Drive Shared Use Path” is an infrastructure initiative in the Road sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The construction of Columbus Drive - Wishingwell Road to Wexford Street Shared-use Path (SUP) consists of upgrading the existing sidewalk (300 meters) on the East side of Columbus Drive from just North of Wishingwell Road to Wexford Street. This will connect the existing SUP’s on either end that were constructed previously for an active transportation route comfortable for use by people of all ages and abilities. The project supports transportation equity by filling gaps in current public transit coverage and connecting neighbourhoods and essential destinations with a shared-use path that will attract people of all ages and abilities to walk, stroll, roll or cycle. The route alignment is part of the Bike St. John’s Master Plan. The existing sidewalk will be replaced with an asphalt surface widened to 3.0 metres. The entire section will be adjacent to the street corridor. The scope of the construction work includes removing existing sidewalk and curb/gutter, minor excavation and grubbing, installation of curb and gutter and trail surface, asphalt reinstatement and finished landscaping. Street crossings and intersections will be upgraded to create a continuous and comfortable route.

Original sector

Active Transportation

Location

Country

Canada

State

Newfoundland and Labrador

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Road, Car parking, Government, Automotive

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project