Columbus Fourth Water Plant
Sector: Water Supply and Storage • Location: Concord Township, Ohio, United States of America
Source: Dodge
New fourth water plant. Initial capacity 48 MGD, expandable to 80 MGD. Construction to include site preparation, electrical substation, and the water plant facility, as well as administration/maintenance building, treatment structures/buildings, clearwells. and a high service pump station
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Residential
- Location
- Concord Township, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Columbus Fourth Water Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New fourth water plant. Initial capacity 48 MGD, expandable to 80 MGD. Construction to include site preparation, electrical substation, and the water plant facility, as well as administration/maintenance building, treatment structures/buildings, clearwells. and a high service pump station |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Concord Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Residential |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
